試題1
關(guān)于中標(biāo)條件的敘述中,( )是最為完整正確的。
A.能夠最大限度地滿足招標(biāo)文件中規(guī)定的各項(xiàng)綜合評(píng)價(jià)標(biāo)準(zhǔn)
B.能夠滿足招標(biāo)文件的實(shí)質(zhì)性要求,并且經(jīng)評(píng)審的投標(biāo)價(jià)格最低
C.能夠很好地滿足招標(biāo)文件中規(guī)定的各項(xiàng)綜合評(píng)價(jià)標(biāo)準(zhǔn)
D.能夠滿足招標(biāo)文件的實(shí)質(zhì)性要求,并且經(jīng)評(píng)審的投標(biāo)價(jià)格合理
查看答案
試題參考答案:A
試題2
小張改良了 一 種數(shù)據(jù)挖掘算法,于2023年1月5日申請(qǐng)了發(fā)明專利,并在2023年9月5日獲得了專利權(quán),專利到期日是()。查看答案
試題參考答案:A
試題3
Retail firms analyze consumer sales trends and user preference through internet user data,This belongs to ()application area.
A、big data
B、cloud computing
C、internet of things
D、artificial intelligence
查看答案
試題參考答案:A
試題4
在進(jìn)行信息編碼時(shí),增加冗余編碼是為了提高信息系統(tǒng)的()。查看答案
試題參考答案:B
試題5
以下關(guān)于信息化的敘述中,不正確的是()查看答案
試題參考答案:A
試題6
The () plan is aiming to integrate the Internet with traditional industries, and fuel economic growth.
A、Internet Plus action
B、Internet action
C、Web Plus action
D、Net Plus action
查看答案
試題參考答案:A
試題7
在.NET架構(gòu)中,( )給開(kāi)發(fā)人員提供了一個(gè)統(tǒng)一的、面向?qū)ο蟮?、層次化的、可擴(kuò)展的編程接口。
A.通用語(yǔ)言規(guī)范
B.基礎(chǔ)類(lèi)庫(kù)
C.通用語(yǔ)言運(yùn)行環(huán)境
D.ADO.NET
查看答案
試題參考答案:B
試題8
( )is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist between them.
A.PERT
B.AOA
C.WBS
D.PDM
查看答案
試題參考答案:D
試題9
Project manager believes that modifying the project scop may provide added value for the customer.The project manager should( ).
A.change the scope baseline
B.contact the customer to determine if the change adds value
C.call a meeting of the change control board
D.change the project's objectives
查看答案
試題參考答案:B
試題10
( ) is the process of identifying individual project risks as well as source of overall project risk, and documenting their characteristics,查看答案
試題參考答案:A
信管網(wǎng)訂閱號(hào)
信管網(wǎng)視頻號(hào)
信管網(wǎng)抖音號(hào)
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門(mén)公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛(ài)好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書(shū)、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過(guò)深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評(píng)論 查看完整評(píng)論 | |