PMP?當(dāng)天每日一練試題地址:m.xomuzic.com/exam/ExamDay.aspx?t1=33
往期PMP?每日一練試題匯總:m.xomuzic.com/class/27/e33_1.html
PMP?每日一練試題(2023/5/18)在線測(cè)試:m.xomuzic.com/exam/ExamDay.aspx?t1=33&day=2023/5/18
點(diǎn)擊查看:更多PMP?習(xí)題與指導(dǎo)
PMP?每日一練試題內(nèi)容(2023/5/18)
試題1
A client requests a scope change request after accepting the design. This change will have a potential impact on several project components. What is the project manager's MOST APP ROPRIATE response?查看答案
試題參考答案:D
試題解析與討論:m.xomuzic.com/st/484339928.html
試題2
企業(yè)中最有效的質(zhì)量管理模式是哪種?查看答案
試題參考答案:C
試題解析與討論:m.xomuzic.com/st/496788876.html
試題3
A CEO announces a new project with cost and time constraint targets. The business case is not yet finalized.Based on experience, the project manager feels strongly that these targets will be unmet. What should the project manager do to ensure the project's success?查看答案
試題參考答案:B
試題解析與討論:m.xomuzic.com/st/4766428078.html
試題4
你的研發(fā)項(xiàng)目正在進(jìn)行之中。這時(shí),客戶要求為產(chǎn)品增加一個(gè)新功能。為了盡量減輕產(chǎn)品功能變更可能給項(xiàng)目帶來的影響,你應(yīng)該()。查看答案
試題參考答案:C
試題解析與討論:m.xomuzic.com/st/4839313746.html
試題5
A project manager starts a new project and is provided with a report showing failures related to purchase that occurred during the last project. This report is the outcome of:查看答案
試題參考答案:A
試題解析與討論:m.xomuzic.com/st/488609411.html
試題6
he project manager must create the project management plan. The project scope is to develop a product that is similar to an existing product in the market. The project manager work ed on this type of product in another company. What should t he project manager do next?查看答案
試題參考答案:C
試題解析與討論:m.xomuzic.com/st/490215279.html
試題7
以下哪項(xiàng)是執(zhí)行組織可以使用的完工估算預(yù)測(cè)技術(shù)∶()查看答案
試題參考答案:D
試題解析與討論:m.xomuzic.com/st/4891214337.html
試題8
一家公司的組織文化是開放的,積極并重視持續(xù)改造,個(gè)人員工在會(huì)議期間自由表達(dá)自己對(duì)流程、政策和程序的意見。項(xiàng)目經(jīng)理希望在項(xiàng)目期間尊重組織的持續(xù)改造價(jià)值。項(xiàng)目經(jīng)理應(yīng)該從哪里收集經(jīng)驗(yàn)教訓(xùn)?查看答案
試題參考答案:A
試題解析與討論:m.xomuzic.com/st/5252810462.html
試題9
在規(guī)劃質(zhì)量階段,有必要確定如何測(cè)量新服務(wù),以確保質(zhì)量水平在可控范圍內(nèi)??捎玫臏y(cè)量方法是?查看答案
試題參考答案:B
試題解析與討論:m.xomuzic.com/st/474758088.html
試題10
You are managing a project to develop a soy-based, lactose-free, magnesium-rich nutritional drink for the"over 50"market. You have recently heard that the client calls your progress reports the"Code of Hammurabi"because they seem to be written in hieroglyphics and are completely indecipherable to all but an Egyptologist. This situation could have been avoided by查看答案
試題參考答案:D
試題解析與討論:m.xomuzic.com/st/4937129096.html
信管網(wǎng)訂閱號(hào)
信管網(wǎng)視頻號(hào)
信管網(wǎng)抖音號(hào)
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評(píng)論 查看完整評(píng)論 | |